Oil Search Home Page
> Activities

Location Maps
Kutubu
Moran
Gobe
Hides GTE
SE Mananda
Nabrajah
PNG Gas Commercialisation
PNG Exploration
Yemen
Egypt
Libya
Iraq
Tunisia
Licence Interests
Reserves
Crude Marketing



Hides GTE

Location

Southern Highlands Province, 80 kilometres north-west of Kutubu

Permit

PDL-1

Oil Search's interest

Oil Search owns 21.5% of PDL-1 (which will increase to 27.5% once a development licence is issued over Hides Extension) and owns 100% of the Gas to Electricity Project

Operator

Oil Search Limited

Remaining Recoverable 2P Reserves (gross, as at 31 Dec 2007)

Hides GTE project: 75.7 bscf plus 1.8 million barrels condensate

Project Overview

Hides

Click here to view photos of the Hides GTE project

The Hides gas field, located in PDL-1, was discovered in 1987. It is a large anticlinal structure, approximately 30 kilometres long and five kilometres wide. Four wells have been drilled on the structure to date.

Gas production commenced in 1991 with the development of the Hides Gas to Electricity Project (GTE). The Hides GTE project consists of a pipeline (PL1) connecting the Hides-1 and Hides-2 wells to a small gas conditioning plant at the Hides Production Facility (HPF) located in the Tagari River valley. Sales gas is then used by the Porgera Joint Venture to generate electricity in an adjacent facility. The electricity is transmitted to the Porgera Gold Mine by overhead wire. Condensate produced along with the gas is distilled into naphtha and diesel which is sold into local markets and used as back-up fuel for the power station. Oil Search owns 100% of the GTE project and is operator. The gas is sold under a gas supply contract, which expires in October 2011, but is likely to be extended, in line with the Porgera mine life.

Reserves

The Hides field contains total proved plus probable reserves and resources of approximately 5.3 tcf of sales gas in the Toro and Digimu reservoirs. Up to the end of 2007, approximately 72 bcf had been produced under the Hides GTE project. The reserves as at 31 December 2007 attributable to the Hides GTE Project (Oil Search - 100%) are 75.7 bscf and 1.8 million barrels of condensate. The remaining volumes are uncommitted.

Recent Performance

Production net to OSH

mmscf 1Q 2Q 3Q 4Q Year
2003 1,308 1,345 1,365 1,326 5,344
2004 1,369 1,387 1,326 1,418 5,501
2005 1,381 1,344 1,345 1,355 5,426
2006 1,131 1,399 1,398 1,200 5,128
2007 1,000 1,100 1,312  1,386 4,798
2008 1,352 1,370     2,723

Latest quarterly report

Production of sales gas for the Hides Gas to Electricity Project during the first quarter of 2008 was 1.352 billion cubic feet, produced at an average daily production rate of 14.9 million cubic feet per day. This was marginally below the previous quarter. 32,000 barrels of condensate was produced for use within the Hides facility and for local sales.